Management of change (MOC) is a process for reviewing and approving changes to equipment, processes or people so new hazards are controlled.

Management of change (MOC) is a formal process for identifying, reviewing, approving and communicating changes to equipment, materials, processes, procedures, facilities or people before they are put in place. Its purpose is to make sure that any new or increased hazards created by a change are found and controlled before anyone is exposed to them.
Many serious industrial incidents have been traced back to changes that seemed small at the time, such as a substituted part, a modified procedure, a new chemical supplier or a temporary bypass that was never removed. MOC gives organizations a structured way to ask "what could go wrong?" before making the change.
In the United States, MOC is a required element of OSHA's Process Safety Management (PSM) standard, 29 CFR 1910.119(l), for facilities that handle highly hazardous chemicals, and of the EPA Risk Management Program. It is also a core part of ISO 45001 and many company safety management systems, and is widely used outside process industries for any significant operational change.
A "replacement in kind," such as swapping a part for an identical one, usually does not need full MOC review, but the organization should define clearly what counts as in kind.
A chemical plant wanted to increase production by raising the flow rate on a reactor feed line. The operations manager submitted an MOC request. The review team, including a process engineer, a maintenance lead and an operator, found that the higher flow would push a relief valve close to its capacity and that operators had never been trained on the new alarm limits.
The plant installed a larger relief valve, updated the operating procedure and alarm settings, and trained all shifts before the change was approved. A pre-startup review confirmed every action was complete before the new rate was introduced.
No. MOC is required for many process facilities, but any organization can use it to manage risks from changes in equipment, procedures, staffing or layout.
Yes, many organizations include organizational changes, such as staffing cuts or new shift patterns, in their MOC process because they can affect safety as much as equipment changes.
A temporary change is one that is meant to last for a limited time. It still needs review, and it must have a set expiry date and a plan to return to normal conditions.
Part of SafetyIQ's EHS glossary: plain-English definitions of workplace health and safety terms.
> Keep learning
> See it in action
Capture hazards, run inspections, track training and close out corrective actions in one platform built for high-risk, field-heavy work.
Book my free demo