Bow-tie analysis is a risk assessment method that maps the threats leading to a loss of control of a hazard, its possible consequences, and the barriers that prevent or limit harm.

Bow-tie analysis is a visual risk assessment method that shows how a hazard could get out of control, what could cause that to happen, what harm could follow, and which barriers stand in the way. The diagram is named for its shape: causes fan out on the left, consequences fan out on the right, and they meet at a central "top event" in the middle, like the knot of a bow tie.
The method is widely used in process safety, oil and gas, chemicals, mining, aviation and other high-hazard industries. It matters because it turns a complex risk into a single picture that operators, engineers and managers can all read. That makes it easier to see which barriers are carrying the most weight, where protection is thin, and what needs to be inspected, tested and maintained to keep major accidents from happening.
Bow-ties are usually built in a facilitated workshop. The team picks one hazard and one top event, lists the credible threats and consequences, then adds the barriers on each pathway. Each barrier is then assigned an owner and checked against agreed quality criteria. Guidance from the Center for Chemical Process Safety (CCPS) describes valid barriers as effective, independent and auditable, meaning each one can stop the sequence on its own and can be verified.
No OSHA regulation requires bow-tie analysis by name. The most widely cited reference is the 2018 concept book Bow Ties in Risk Management, published jointly by CCPS and the UK Energy Institute, which sets out common terminology and good practice. Bow-ties are often used alongside other methods to support process safety management (PSM) programs under 29 CFR 1910.119, which require a process hazard analysis (PHA) using a recognized methodology such as HAZOP, what-if or fault tree analysis.
A chemical distribution site stores flammable solvents in bulk tanks and transfers them to drums. The safety team runs a bow-tie workshop with operators and maintenance staff on the top event "loss of containment during drum filling." On the left, they list threats such as tank overfill, hose failure and a vehicle striking the transfer line. On the right, they list consequences such as a pool fire, worker exposure and a release to the drain.
When the team adds barriers, they find that two threats depend on a single operator check with no independent backup. They add a high-level shutoff and vehicle barriers, assign owners for each, and set inspection intervals. The completed diagram is posted in the control room and used in shift briefings, so new operators can quickly see which controls matter most.
No. OSHA does not require bow-tie analysis by name. It is a recognized good practice that can support PSM, hazard analysis and risk communication.
A hazard is the source of potential harm, such as stored energy or a toxic chemical. A threat is a specific cause that could release or lose control of that hazard.
It is mainly qualitative. Teams can add frequency or probability data, often through LOPA, when they need a numerical risk estimate.
There is no fixed number. The right number depends on the severity of the consequence and the strength of each barrier, which is why barrier quality matters more than barrier count.
Part of SafetyIQ's EHS glossary: plain-English definitions of workplace health and safety terms.